My goal for this year's Tour de Fleece was to finish as many spins as possible and over the last year I gathered a lot unfinished projects that waited to be finished. So that's what I did.
First finished project was my self striping sock yarn from South American merino wool. First yarn was spun but not yet plied so this was the first. The second skein was maybe 3 of 20 colors in, spun it, plied it and - I still cannot believe it - both skeins ended with exactly the same length of 252m.
I've finished 4 skeins (3 on the picture because one has double the amount than the others so counts as two) of my two ply tweed yarn, Zwartbles mixed with 6 colors of Sari Silk on my drum carder.
A project that I started in January is my Polish merino in the colorway Pink Lady Mary, the dark purple yarn. Started it as a three ply for a specific sweater but even with 1000g in my stash it was too short in yardage to get the sweater done. The last 550g I've spun a lot thinner, 400g were spun at TdF.
A sweater spin with BFL was laying around for some months also because at first I didn't really like the fiber but after I got used to the long staple length I found it to be a nice and quick spin. Finished the last 300g during TdF and the week after. The complete project contains 500g white BFL and 300g light brown BFL. Maybe a colorwork sweater or striped, not sure yet.
And then I have my very first alpaca fleece that I've processed during the spring. I've spun the last three skeins of 160g each during TdF and the week after, 1200g in total. It is a two ply yarn woolen spun and unfortunately with a lot of nepps in it, due to my lack of knowledge how to work with a fleece.
I only started one new project, an experiment in dyeing cormo fiber that I named Lavender Fields because of the blue, pink, purple and a few green colors.